The whole factory covers an area of 40000 square meters (exclude stereoscopic warehouse). All the raw materials are transported

within one facility to reduce the secondary pollution.

In order to be a paperless office, our order process will be operated by OA+EPR system.

Liquid making workshop and liquid filling workshop are all GMP workshop.

Within 8 hours we can produce 40 tons liquid(taking 30ml tube as example, 40 tons liquid need 1.3 million 30ml tubes)

million tubes).All the boiler will adapted CIP cleaning method. All the water will be II grade water.

There will be 6 Semi-automatic lines and 8 full-automatic lines. We can fill 500000-600000 tubes or bottles within 8 hours.

Tube workshop will be 6 printing lines and we hace one 8 color printing machine.

Two automatic head injecting machine( most advanced in China now), labeller and full-automatic gold stamping machine, full-automatic UV printing machine, sealing machine for shrink film. The diameter of mould will be from 19cm to 50cm.

Bottle workshop can produce PE and two layers PE bottle. With labeling and multi-color UV printing machine.

There will be 50 injection machines, daily output will be 800000pcs to 1200000pcs.

Copyright © 2015.iHotel Guest Amenities Co.,Ltd 

苏ICP备15053197号-1  Technical Support:www.300.cn yangzhou